4-2
F-581-R1
CALIBRATION AND PROGRAMMING
Figure 4-2: Computer Interface Cables
5. You are now ready to begin monitoring and operating
the forklift functions and parameters.
6.
Follow the screens shots provided below to navigate
through the Plus 1 capabilities and forklift forklift
performance checks.
IMPORTANT
The status is provided at the bottom of the computer
screen See Figure 4-3.
Figure 4-3: Connected Status
Figure 4-4: Communication Problem
NOTES
If there’s any communication problems between the
forklift and your computer, you will see a message like
Figure 4-4.
Содержание Bendi B40i4
Страница 2: ......
Страница 26: ...1 20 F 581 R1 INTRODUCTION SAFETY AND INSPECTION...
Страница 100: ...3 52 F 581 R1 TROUBLESHOOTING AND CORRECTIVE MAINTENANCE...
Страница 120: ...4 20 F 581 R1 CALIBRATION AND PROGRAMMING...
Страница 129: ...ENGINE WITH FUEL SYSTEM 5 9 Figure 5 10 Fuel System Troubleshooting...
Страница 133: ...ENGINE WITH FUEL SYSTEM 5 13...
Страница 134: ...5 14 F 581 R1 ENGINE WITH FUEL SYSTEM...
Страница 140: ...6 2 F 581 R1 GM ENGINE SUPPLIER PROVIDED DOCUMENTATION...