NeoTherm LC Boilers and Water Heaters
Page 29
Fig. 19 - DHW Piping - Two Heaters, Two Vertical Tanks
NOTES:
1. Optional CWMU & recirculation
line location.
2. Locate the NTV DHW sensor
or remote aquastat well
in lower 1/3 of tank.
3. Back flow preventer may be
required - check local codes.
4. Thermal expansion tank may be
required - check local codes.
5.
Caution: Pump sizing must
be based upon water
hardness at job site.
WARNING:
This drawing shows
suggested piping configuration and
valving. Check with local codes and
ordinances for additional requirements.
Building
return
Supply
TPRV
2
Ball valve
(typical)
2
1
3
4
3
Cold water
supply
Expansion
tank
4
Pump
Pump
Check valve
Check valve
TPRV
6B.6 NTV Suggested Pumps
See Table 8 for water flow and head requirements.
Note - The head loss for the piping, fittings, and
accessories must be calculated and added to the
heater head loss to get the total required pump head.
An undersized pump will result in insufficient flow.
The can result in scale buildup and failure of the
heat exchanger.
6B.7 Condensate Drain Trap
A condensate drain trap is included with the
NeoTherm LC and is designed to drain the boiler
of condensate. The vent condensate should be
drained through a drain tee located in the vent line.
This will help prevent excessive condensate from
entering the boiler condensate trap and preventing
the boiler from operating.
Connect a 3/4” PVC pipe between the drain
connection and a floor drain (or condensate pump if
a floor drain is not accessible).
The condensate drain must be installed to prevent
the accumulation of condensate. When a condensate
pump is not used, the tubing must continuously slope
downward toward the drain with no spiraling.
Consult local codes for the disposal method.
Caution
Condensate is mildly acidic (pH
=
5), and may harm
some floor drains and/or pipes, particularly those
that are metal. Ensure that the drain, drainpipe,
and anything that will come in contact with the
condensate can withstand the acidity, or neutralize
the condensate before disposal.
Damage caused by
failure to install a neutralizer kit or to adequately
treat condensate will not be the manufacturer’s
responsibility.
Содержание NTH1000
Страница 4: ...LAARS Heating Systems ...
Страница 11: ...NeoTherm LC Boilers and Water Heaters Page 7 Fig 6 Dimensions NT 1700 ...
Страница 37: ...NeoTherm LC Boilers and Water Heaters Page 33 Fig 21 Ladder Diagram ...
Страница 38: ...LAARS Heating Systems Page 34 Fig 22 Wiring Diagram ...
Страница 39: ...NeoTherm LC Boilers and Water Heaters Page 35 ...
Страница 51: ...NeoTherm LC Boilers and Water Heaters Page 47 Fig 51 Connection Terminals ...
Страница 128: ...LAARS Heating Systems Page 124 Fig 140 Machine Frame NT1000 13 3 Parts Illustrations ...
Страница 129: ...NeoTherm LC Boilers and Water Heaters Page 125 Fig 141 Rear Panel NT1000 Fig 142 Rear Panel NT1700 ...
Страница 130: ...LAARS Heating Systems Page 126 Fig 143 Machine Frame NT1700 ...
Страница 131: ...NeoTherm LC Boilers and Water Heaters Page 127 Fig 144 Front Panels and Covers NT1000 and NT1700 ...
Страница 132: ...LAARS Heating Systems Page 128 Fig 145 Burners and Combustion Chamber NT1000 ...
Страница 133: ...NeoTherm LC Boilers and Water Heaters Page 129 Fig 146 Burners and Combustion Chamber NT1700 ...
Страница 134: ...LAARS Heating Systems Page 130 Fig 147 Heat Exchanger Components NT1000 and NT1700 Fig 148 Burner Detail NT1000 ...
Страница 135: ...NeoTherm LC Boilers and Water Heaters Page 131 Fig 149 Burner Detail NT1700 ...
Страница 136: ...LAARS Heating Systems Page 132 Fig 150 Electronic Components Fig 151 Condensate Trap NT1000 ...
Страница 137: ...NeoTherm LC Boilers and Water Heaters Page 133 Fig 152 Condensate Trap NT1700 Fig 153 Flow Switch NT1000 and NT1700 ...
Страница 138: ...LAARS Heating Systems Page 134 This page intentionally left blank ...
Страница 139: ...NeoTherm LC Boilers and Water Heaters Page 135 This page intentionally left blank ...