![Kurtz Ersa HR 550 XL Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/kurtz-ersa/hr-550-xl/hr-550-xl_translation-of-the-original-operating-manual_2011336036.webp)
4 | Transport, installation, storage, disposal
Unpacking and installing the Rework system
3
5
3
2
1
4
Fig. 3:
The Rework system in its opened packaging, on a forklift
d) Do not remove the hoisting slings (3).
e) Remove the center support (4) and lay it aside.
f) Remove the foam packaging (2).
g) Take the accessories out of their cardboard box (1) and lay them aside.
h) Release the power cable from its fastener and place it on the bottom heating.
DANGER
Severe or fatal injury from falling load!
a) Transport work may only be performed by properly trained and qualified person-
nel!
b) Do not stand or walk below suspended loads!
c) Only use proper lifting equipment, suitable for the load!
Ersa GmbH
Operating instructions HR 550 XL EN 3BA00247-01 | Rev. 1
36 / 157
Содержание HR 550 XL
Страница 2: ......
Страница 6: ......
Страница 22: ...2 Technical data PC system requirements Ersa GmbH Operating instructions HR 550 XL EN 3BA00247 01 Rev 1 22 157...
Страница 153: ...9 Spare and wear parts Spare parts Ersa GmbH Operating instructions HR 550 XL EN 3BA00247 01 Rev 1 153 157...
Страница 156: ...10 Annex EC Declaration of Conformity Ersa GmbH Operating instructions HR 550 XL EN 3BA00247 01 Rev 1 156 157...
Страница 157: ......