Section 5
Service Procedures
72183211
8-2016/Rev 01
ORIGINAL INSTRUCTIONS
5-25
Severe injury can result if the machine is not properly locked out.
Observe electrical Lockout/Tagout procedures before performing
maintenance.
Ensure all pressure is relieved or blocked from the high pressure
circuits before performing maintenance.
2.
Disconnect all high and low pressure connections, following the procedure, High and Low
Pressure Connections.
3.
Unload the tie rods, following the procedure, Unloading the Tie Rods.
4.
Remove the end cap assembly, high pressure cylinder and inlet check valve assembly.
Discard the inlet poppet, inlet poppet compression spring, sleeve and dynamic seal
compression spring from the inlet check valve assembly. Discard the high pressure
cylinder and the o-ring.
Figure 5-12: Major Kit Disassembly
5.
If the dynamic seal carrier was not removed from the high pressure cylinder, position two
flat screwdrivers in the groove in the outside diameter of the carrier. Carefully pry the
carrier from the cylinder.
6.
Remove and discard the complete assembly to include the dynamic seal, rod seal and
carrier.
Содержание TRILINE
Страница 1: ...MANUAL 72183162 R01 TRILINE DIRECT DRIVE PUMP OPERATION AND MAINTENANCE MANUAL ...
Страница 104: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 4 Figure 8 1 Minor Maintenance Kit ...
Страница 106: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 6 Figure 8 2 Major Maintenance Kit ...