
72183261
8-2016/Rev 01
ORIGINAL INSTRUCTIONS
ii
3
Maintenance ........................................................................................................... 3-1
3.1
Overview ................................................................................................ 3-1
3.2
Maintenance ........................................................................................... 3-1
Daily Inspection ..................................................................................... 3-1
Periodic Maintenance............................................................................. 3-1
Mandatory Maintenance Schedule ......................................................... 3-3
High Pressure System Maintenance....................................................... 3-5
3.3
Maintenance Precautions ....................................................................... 3-5
4
Operation ................................................................................................................ 4-1
4.1
Overview ................................................................................................ 4-1
4.2
Preparing the Pump for Startup.............................................................. 4-2
4.3
Starting the Pump ................................................................................... 4-3
5
Service Procedures ................................................................................................. 5-1
5.1
Overview ................................................................................................ 5-1
5.2
Service and Maintenance Overview ...................................................... 5-2
Specialized Maintenance Tools ............................................................. 5-3
Mandatory Maintenance Schedule ......................................................... 5-3
5.3
High and Low Pressure Connections ..................................................... 5-4
5.4
Loading and Unloading the Tie Rods .................................................... 5-5
Unloading the Tie Rods ......................................................................... 5-6
Loading the Tie Rods ............................................................................. 5-8
5.5
Minor Maintenance Kit .......................................................................... 5-11
Lapping the Discharge Check Valve Body ............................................ 5-15
Discharge Check Valve Assembly Installation...................................... 5-16
End Cap Assembly ................................................................................. 5-16
Plunger Torque Verification .................................................................. 5-17
Subplate Adapter Installation ................................................................. 5-17
Dynamic Seal Installation ...................................................................... 5-17
High Pressure Cylinder Installation ....................................................... 5-19
Inlet Check Valve Assembly Installation .............................................. 5-19
End Cap Installation ............................................................................... 5-20
Pressure Control Valve Maintenance ..................................................... 5-21
5.6
Major Maintenance Kit .......................................................................... 5-23
Discharge Check Valve Assembly Installation...................................... 5-27
End Cap Assembly ................................................................................. 5-28
Plunger Removal and Installation .......................................................... 5-28
Subplate Adapter Installation ................................................................. 5-29
Dynamic Seal Installation ...................................................................... 5-29
High Pressure Cylinder Installation ....................................................... 5-30
Inlet Check Valve Assembly Installation .............................................. 5-31
End Cap Installation ............................................................................... 5-32
Pressure Control Valve Maintenance ..................................................... 5-32
Replacing the Belts ................................................................................ 5-34
5-7
Pressure Control Valve Maintenance Kit .............................................. 5-35
Содержание TRILINE
Страница 1: ...MANUAL 72183162 R01 TRILINE DIRECT DRIVE PUMP OPERATION AND MAINTENANCE MANUAL ...
Страница 104: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 4 Figure 8 1 Minor Maintenance Kit ...
Страница 106: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 6 Figure 8 2 Major Maintenance Kit ...