
Section 2
Installation
72183178
4-2016/Rev 0
ORIGINAL INSTRUCTIONS
2-8
Measurements and Dimensions
Tubing must be cut to the proper length, both ends of the tubing must then be coned, threaded and
deburred.
To determine the tube length, measure the distance between the fittings, and add two times the
engagement allowance shown in Table 2-5. Table 2-6 lists the required cone and thread
dimensions illustrated in Figure 2-4.
Table 2-5
Engagement Allowance (EA)
1/4” Tubing
0.49” (12.4 mm)
Figure 2-3: Tube Length
3/8” Tubing
0.68” (17.3 mm)
9/16” Tubing
0.86” (21.8 mm)
Figure 2-4: Cone and Thread Dimensions
Table 2-6
Cone and Thread Dimensions
Tube OD
Tube ID
D
(Maximum)
L
(Maximum)
Thread
UNF-LH
1/4” (6.35 mm)
0.083” (2.11 mm)
0.125” (3.2 mm)
0.562” (14.3 mm)
1/4” - 28
3/8” (9.52 mm)
0.125” (3.18 mm
0.219” (5.6 mm)
0.750” (19.1 mm)
3/8” - 24
9/16” (14.29 mm)
0.188” (4.78 mm)
0.281” (7.1 mm)
0.938” (23.8 mm)
9/16” - 18
Содержание TRILINE
Страница 1: ...MANUAL 72183162 R01 TRILINE DIRECT DRIVE PUMP OPERATION AND MAINTENANCE MANUAL ...
Страница 104: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 4 Figure 8 1 Minor Maintenance Kit ...
Страница 106: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 6 Figure 8 2 Major Maintenance Kit ...