
Section 5
Service Procedures
72183211
8-2016/Rev 01
ORIGINAL INSTRUCTIONS
5-6
Do not attempt to tighten the tie rod nuts using a torque wrench. No other methods
than those described in this section may be used to load the tie rods.
Unloading the Tie Rods
1.
Ensure the loading tool is clean and free of leaks or damage.
2.
Rotate the tool plunger counter-clockwise until it stops to ensure it is fully retracted.
Rotate the tool plunger
by hand only
to prevent damage to the tool.
3.
Ensure the tie rods are clean and free of debris.
Figure 5-3: Unloading the Tie Rods
4.
While supporting the tool, hand-tighten the tool studs to thread the tool onto the end of the
tie rods.
Alternate between opposite studs to bring the tool in evenly and prevent binding.
Содержание TRILINE
Страница 1: ...MANUAL 72183162 R01 TRILINE DIRECT DRIVE PUMP OPERATION AND MAINTENANCE MANUAL ...
Страница 104: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 4 Figure 8 1 Minor Maintenance Kit ...
Страница 106: ...Section 8 Parts List 72183245 8 2016 Rev 01 ORIGINAL INSTRUCTIONS 8 6 Figure 8 2 Major Maintenance Kit ...