8 Servicing/Maintenance
45 of 80
KSB Delta Primo
1983.811/02-EN
Fig. 17:
Removing the manifold
6. Remove the entire manifold (with shut-off valves).
A
A
Fig. 18:
Loosening the EF locknut
A
EF locknut
7. Undo the EF locknut at both shut-off valves by half a turn. The O-ring is now
exposed.
B
B
A
Fig. 19:
Turning the pressure measuring set
A
Pressure measuring set
B
Lever of the shut-off valve
Содержание Delta Primo F
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ...KSB B V Kalkovenweg 13 2401 LJ Alphen aan den Rijn Netherlands 1983 811 02 EN...