Contents
5 of 116
CHTRa
Supervision...................................................................................................................................................... 73
7.1.1
7.3.10 Dismantling the rotor ........................................................................................................................ 88
7.3.11 Removing the impellers from the rotor ........................................................................................... 88
7.3.12 Removing the impeller wear ring ..................................................................................................... 90
7.4.10 Securing the mechanical seal in place .............................................................................................. 97
7.4.11 Final assembly .................................................................................................................................... 98
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...