6 Commissioning/Start-up/Shutdown
48 of 116
CHTRa
6 Commissioning/Start-up/Shutdown
6.1 General information
DANGER
Improper transport
Danger to life from falling parts!
▷
Observe the safety regulations for transport work. (
▷
Observe the applicable local occupational safety and accident prevention
regulations.
WARNING
Unintentional starting of the pump set
Risk of injury by moving components and shock currents!
▷
Ensure that the pump set cannot be started unintentionally.
▷
Always make sure the electrical connections are disconnected before carrying
out work on the pump set.
DANGER
Work on the pump set by unqualified personnel
Danger of death from electric shock!
▷
Always have the electrical connections installed by a trained electrician.
▷
Observe regulations IEC 30364 (DIN VDE 0100) and, for explosion-proof models,
EN 60079.
▷
The pump set's electrical equipment must comply with the general
requirements of the EN 60204-1 standard.
6.2 Work to be carried out prior to commissioning/start-up
6.2.1 Removing the preservation
WARNING
Fluids handled, consumables and supplies which are hot and/or pose a health
hazard
Hazard to persons and the environment!
▷
Collect and properly dispose of flushing fluid and any fluid residues.
▷
Wear safety clothing and a protective mask if required.
▷
Observe all legal regulations on the disposal of fluids posing a health hazard.
6.2.1.1 Internal preservation
If the pump has been filled with a glycol/water mixture for preservation, this mixture
has to be drained prior to any further work.
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...