5 Installation at Site
27 of 116
CHTRa
5.3 Unpacking the pump set components
DANGER
Improper transport
Danger to life from falling parts!
▷
Use a stable mounting frame.
▷
Always coordinate all unpacking work with the responsible site management/
operator.
▷
Use personal protective equipment.
WARNING
Parts falling down during unpacking
Risk of crushing injuries!
▷
Secure loose parts (e.g. box lids) against falling down.
CAUTION
Open or closed connections and openings
Damage to the pump!
▷
During installation, do not open connections and openings earlier than
necessary. (All openings and connections are closed at the factory.)
▷
Prior to commissioning/start-up, check on the basis of the information given in
whether the openings and connections must be open or closed.
▪
Do not unpack the pump set components until immediately before the
installation work starts. Take care not to damage the cable.
▪
The consignee of the components supplied is responsible for disposal of the
packaging.
▪
Completely cover the unpacked pump set components on site to protect them
against dirt, moisture, spark discharge, grinding dust and other harmful ambient
influences. Take special care to adequately protect instruments, electric cables
and wiring ducts.
▪
Spare parts and parts which are not immediately needed must be stored.
NOTE
If components of the pump set became damaged, wet or dirty, inform KSB.
5.4 Removing the preservation
NOTE
If the pump has been specially preserved for storage of more than 12 months or sea
transport, the necessary measures for removal of preservation prior to installation
must be carried out. (
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...