5 Installation at Site
44 of 116
CHTRa
1
2
5
4
3
6
Fig. 24:
Vacuum balance system
1
Vessel under vacuum
2
Vacuum balance line
3
Shut-off element
4
Swing check valve
5
Main shut-off element
6
Vacuum-tight shut-off element
NOTE
An additional line fitted with a shut-off valve (from the pump discharge nozzle to
the balance line) facilitates venting of the pump before start-up.
5.16.7 Bypass and balancing lines
CAUTION
Impermissible piping layout
Damage to the balancing system
▷
When installing the bypass line and the balancing line, the minimum flow
diagram and/or P + I diagram must be observed.
▷
Install an orifice immediately ahead of the inlet vessel to avoid vaporisation.
5.17 Electrical connection
DANGER
Electrical connection work by unqualified personnel
Risk of fatal injury due to electric shock!
▷
Always have the electrical connections installed by a trained and qualified
electrician.
▷
Observe regulations IEC 60364 and, for explosion-proof models, EN 60079.
WARNING
Incorrect connection to the mains
Damage to the mains network, short circuit!
▷
Observe the technical specifications of the local energy supply companies.
1. Check the available mains voltage against the data on the motor name plate.
2. Select an appropriate starting method.
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...