6 Commissioning/Start-up/Shutdown
50 of 116
CHTRa
CAUTION
Incorrect commissioning/start-up
Damage to the bearings!
▷
Do not perform oil flushing until immediately before commissioning/start-up.
▷
If commissioning/start-up is delayed by more than one month, repeat the oil
flushing.
1. Dismantle the pump-end coupling hub.
2. Dismantle the bearings.
3. For oil flushing mount the bearing housings including the existing labyrinth
rings and throwers without internal parts (bearing shells, bearing segment
carrier, thrust bearing plate, etc.).
4. Check whether all connections on the bearing housings and covers are closed
with plugs.
5. Re-install the pump bearings and lift the pump rotor.
6. Re-mount the pump-end coupling hub.
7. Mount the coupling cover if applicable.
8. Check all the connection points of the oil circuit. Connect and seal if required.
9. Close the oil supply ports of the coupling cover if applicable.
10. Fully open all throttle valves in the oil supply lines.
11. Switch on the oil supply unit or auxiliary oil pump and check for leakage.
12. Check the oil flow at the oil sight gauge in the oil return lines.
13. Check the oil level of the oil reservoir and top up if required.
When the coolers and pipes are filled and vented, the oil level shall be in the
middle between the minimum and maximum mark of the oil sight gauges.
14. Change over and clean the filters of the oil circuits frequently, see the
manufacturer’s catalogue.
15. Switch off the oil supply unit or auxiliary oil pump when the oil filters are free
from dirt for at least eight hours.
16. Check the oil quality. If required, clean or replace the oil.
6.2.5 Filling in lubricants (if applicable)
DANGER
Ignition of lubricant leakage on hot pump surfaces
Explosion hazard!
▷
The ignition temperature of the lubricant should exceed the maximum surface
temperature of the pump by at least 50 K.
CAUTION
Incorrect oil level in bearing housing
Damage to the pump!
▷
Check the oil level only during standstill of the pump!
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...