6 Commissioning/Start-up/Shutdown
55 of 116
CHTRa
6.2.9.2 Mounting the coupling cover (optional)
WARNING
Risk of hot oil escaping as a result of an improperly mounted/dismantled coupling
cover
Risk of burns!
Damage to the coupling!
▷
Do not damage the seal elements and sealing surfaces.
▷
Never operate the coupling without a lubricant.
▷
Prior to putting the coupling into service, check the coupling cover for correct
installation and sealing.
Fig. 29:
Coupling cover
1. Meticulously clean the locating and sealing surfaces.
2. Fit the gasket and O-ring.
3. Mount the lower coupling cover half and fasten it to the adapter.
Fig. 30:
Adjusting the injection nozzles
4. Adjust the injection nozzles (see figure Adjusting the injection nozzles).
5. Coat the sealing surfaces of the cover flanges with a liquid, oil and temperature
resistant sealing agent (up to 120° C).
6. Use the eyebolt as a transport aid as shown in figure Coupling cover.
7. Fit the upper coupling cover half to the adapter.
8. Fix the upper and lower halves with 2 taper pins and fasten with screws.
9. Connect the pipes to the cover.
6.2.9.3 Fitting the contact guard for the shaft seal
Fasten the contact guard to the pump casing by means of screws.
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...