3.1 Checking the condition upon delivery
Check each packaging unit for damage before it is stored In the event of in-transit
damage, assess the exact damage, document it and notify KSB about the damage in
writing immediately.
3.2 Transporting the packaged components of the pump set
ü
The weights of the individual components to be transported have been
identified in the packing list.
ü
Suitable lifting equipment has been selected.
1. Attach the handling gear and/or transport ropes as shown on the packaging.
Observe the markings for fastening points and the centre of gravity.
Fastening points
Centre of gravity
Transport the transport boxes as indicated.
NOTE
The angle
α
depends on the lifting tackle; however it must never be wider than
120°.
α
Fig. 1:
Hoisting the transport box
Содержание CHTRa
Страница 1: ...Process Pump CHTRa Installation Operating Manual...
Страница 112: ...10 Related Documents 112 of 116 CHTRa 10 5 Order specific documents...
Страница 114: ...Index 114 of 116 CHTRa W Warnings 9 Warranty claims 7 Weight 110...
Страница 115: ......
Страница 116: ...KSB SE Co KGaA Johann Klein Stra e 9 67227 Frankenthal Germany Tel 49 6233 86 0 www ksb com 2700 81 03 EN...