![Krone Round Pack 1250 Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/krone/round-pack-1250/round-pack-1250_original-operating-instructions_2004825046.webp)
V - 12
Basic Settings and Operation
5.6.3 General Information
The twine is threaded from the twine box over the twine eyelet and the twine brake to the stepped roller (8). From
thereit is threaded via the twine wrapping mechanism (2) between the rubber-coated roller (4) and the pressure roller
(3) and into the area around the cutter bar (1). When the wrapping process begins, the rubber-coated roller (4) is
actuated and feeds the twine into feed channel and the rotating round bale. The twine is picked up by the round bale
along with the baling material.
The twine wrapping system (2) leads one of the twines from the centre to the outside and then back again to the
centre. At the same time the other twine is led from the outside to the centre and then back again to the outside.
A sensor on the twine wrapping mechanism signals the final stage of the wrapping process.The twine is then cut and
the wrapping process is ended.
1 cutter bar
2 twine wrapping mechanism
3 pressure roller
4 rubber roller
6 twine box
7 pressure roller tension spring
8 stepped roller
5.6.2.2
Components twine wrapping
VP-3-009
6
3
7
8
2
4
1
Содержание Round Pack 1250
Страница 20: ...II 10 Safety ...
Страница 34: ...IV 6 Use ...
Страница 61: ...V 27 Basic Settings and Operation ...
Страница 62: ...V 28 Basic Settings and Operation ...
Страница 84: ...VIII 16 Control unit Comfort ...
Страница 96: ...IX 12 Maintenance VP100101 1 Z 2a 9 H L 4 a1 11 12 I II 5 3 3 2b a2 H L 6 Z m in 0 2a 2b 7 7 ...
Страница 111: ...IX 27 Maintenance ...
Страница 112: ...IX 28 Maintenance ...
Страница 114: ...X 2 Winter Storage ...
Страница 122: ...XII 6 Faults Causes and Remedy ...
Страница 134: ...A 12 Appendix ...
Страница 135: ...A 13 Appendix ...