![Krone Round Pack 1250 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/krone/round-pack-1250/round-pack-1250_original-operating-instructions_2004825031.webp)
IV - 3
Use
4.4 Wrapping and Depositing Bales
•
Start twine or net wrapping process (see the
Operation chapter), continue pick-up of baling
material until the twine or net wrapping material
enters the bale chamber and collected by the
round bale, maintain the nominal speed of 540
rpm when doing this, until the wrapping process is
complete.
• Stop the tractor and wait until the twine or net wrapping
process is complete.
• Eject round bales by opening the bale chamber.
• Close the bale chamber and start the next baling
process simultaneously.
Barrel-shaped round bales can cause
damage to the floor conveyor. Distorted
and thick round bales are detrimental to
proper silage production.
The binding process should be started at the
latest when the density indicators reach the
red range (the buzzer sounds if the comfort
control equipment is fitted).
To prevent overload on the round baler
when handling certain types of crop (e.g.
wet silage), the binding process should
already be started at an earlier point. Per-
manent overload can drastically reduce the
service life of the round baler.
Содержание Round Pack 1250
Страница 20: ...II 10 Safety ...
Страница 34: ...IV 6 Use ...
Страница 61: ...V 27 Basic Settings and Operation ...
Страница 62: ...V 28 Basic Settings and Operation ...
Страница 84: ...VIII 16 Control unit Comfort ...
Страница 96: ...IX 12 Maintenance VP100101 1 Z 2a 9 H L 4 a1 11 12 I II 5 3 3 2b a2 H L 6 Z m in 0 2a 2b 7 7 ...
Страница 111: ...IX 27 Maintenance ...
Страница 112: ...IX 28 Maintenance ...
Страница 114: ...X 2 Winter Storage ...
Страница 122: ...XII 6 Faults Causes and Remedy ...
Страница 134: ...A 12 Appendix ...
Страница 135: ...A 13 Appendix ...