
Operation
75
Pos : 22.31 /Ü berschriften/Ü berschriften 3/A-E/Blink- und Positi onsleuchten r ec hts/li nks ansc hließ en @ 15\mod_1232964594364_78.doc @ 177111
8.3.3
Connecting indicators and position lights on the right/left
Pos : 22.32 /BA/Bedienung /Vorsätze/Maisgebiss /Blink- und Positi onsleuc hten rec hts / links anschli eßen @ 15\mod_1232965918520_78.doc @ 177270
Fig. 54:
•
Insert connection cables (2) for the indicators and position lights (1) into the relevant
socket (3) on both sides of the maize header.
•
Check the lighting for function.
Pos : 22.33 /Ü berschriften/Ü berschriften 3/F-J/Frontsc hutz montier en @ 15\mod_1232964654301_78.doc @ 177131
8.3.4
Installing the front guard
Pos : 22.34 /BA/Bedienung /Vorsätze/Maisgebiss /Frontsc hutz montier en @ 15\mod_1232966023223_78.doc @ 177292
Fig. 55:
•
Fit the front guard (1) on the right and left sides of the support on the guards and centrally
on the central tip. Pay attention to the stipulated position of the warning stripes (2) (the
hatching must point downwards and outwards).
•
Secure front guard (1) on the right and left with spring cotter pins (3) and hook tension
spring (4) on the central tip.
Pos : 23 /BA/-----Sei tenumbruch------ @ 0\mod_1196175311226_0.doc @ 4165