![Komatsu WA500-6H Скачать руководство пользователя страница 239](http://html1.mh-extra.com/html/komatsu/wa500-6h/wa500-6h_operation-and-maintenance-manual_1991108239.webp)
Operation
3.7 Troubleshooting
WA500-6H – VEAM430100
3-173
5. Loosen air bleeder (4) of the supply pump and the operator
the priming pump to prime with fuel.
Fuel will overflow from air bleeder (4). Continue priming until
no more bubbles come out with the fuel, then tighten air
bleeder (4).
Tightening torque:
4.9 to 6.9N·m {0.5 to 0.7kgf·m, 3.6 to 5.1 lbft}
NOTE
Do not use feed pump (5) supplied with the supply pump.
6. Carry out priming a further approx. 20 times, then securely
tighten wing nut (3) holding the lever of the priming pump.
Tightening torque:
11.8N·m {1.2kg·m, 8.7lbft}
7. Turn the starting switch to the START position. The engine
will start.
GK050177
4
5
Содержание WA500-6H
Страница 2: ......
Страница 3: ...Foreword WA500 6H VEAM430100 1 1 1 Foreword...
Страница 26: ...1 7 CE Conforming equipment Foreword 1 24 WA500 6H VEAM430100...
Страница 254: ...3 7 Troubleshooting Operation 3 188 WA500 6H VEAM430100...
Страница 344: ...4 9 Service procedure Every 12000 hours service Maintenance 4 90 WA500 6H VEAM430100...
Страница 345: ...Technical Data WA500 6H VEAM430100 5 1 5 Technical Data...
Страница 347: ...Technical Data 5 1 Technical data WA500 6H VEAM430100 5 3 GK032301 A B H I G C E F D...
Страница 352: ...5 4 Limit values for slopes Technical Data 5 8 WA500 6H VEAM430100...
Страница 401: ...Index WA500 6H VEAM430100 7 1 7 Index...
Страница 407: ...Notes WA500 6H VEAM430100 8 1 8 Notes...
Страница 408: ...Notes 8 2 WA500 6H VEAM430100...
Страница 409: ...Notes WA500 6H VEAM430100 8 3...
Страница 410: ...Notes 8 4 WA500 6H VEAM430100...
Страница 411: ...Notes WA500 6H VEAM430100 8 5...
Страница 412: ...Notes 8 6 WA500 6H VEAM430100...