Operation
3.3 Operation
WA500-6H – VEAM430100
3-153
9. Use the same procedure as in steps 1 to 7 to install the
bucket link pin.
Assemble a pin that has no grease hole at the bucket link.
10. Coat the bucket hinge pin and bucket link pin with grease.
For details, see "Lubricating (4-61)".
For details of removing and installing the bucket, please con-
tact your KOMATSU distributor.
Содержание WA500-6H
Страница 2: ......
Страница 3: ...Foreword WA500 6H VEAM430100 1 1 1 Foreword...
Страница 26: ...1 7 CE Conforming equipment Foreword 1 24 WA500 6H VEAM430100...
Страница 254: ...3 7 Troubleshooting Operation 3 188 WA500 6H VEAM430100...
Страница 344: ...4 9 Service procedure Every 12000 hours service Maintenance 4 90 WA500 6H VEAM430100...
Страница 345: ...Technical Data WA500 6H VEAM430100 5 1 5 Technical Data...
Страница 347: ...Technical Data 5 1 Technical data WA500 6H VEAM430100 5 3 GK032301 A B H I G C E F D...
Страница 352: ...5 4 Limit values for slopes Technical Data 5 8 WA500 6H VEAM430100...
Страница 401: ...Index WA500 6H VEAM430100 7 1 7 Index...
Страница 407: ...Notes WA500 6H VEAM430100 8 1 8 Notes...
Страница 408: ...Notes 8 2 WA500 6H VEAM430100...
Страница 409: ...Notes WA500 6H VEAM430100 8 3...
Страница 410: ...Notes 8 4 WA500 6H VEAM430100...
Страница 411: ...Notes WA500 6H VEAM430100 8 5...
Страница 412: ...Notes 8 6 WA500 6H VEAM430100...