2.
Set the lock lever to FREE position (F).
3.
Place the machine on a firm, level ground.
4.
Set the work equipment to the posture shown in the figure
according to the following procedure.
1) Operate the work equipment control levers, and re-
tract arm cylinder and bucket cylinder to their stroke
end (maximum reach posture of arm and bucket).
2) Operate the boom swing control pedal to swing the
boom to the center position.
3) Operate the work equipment control lever, and raise
the work equipment to height (a) of 1.5 m and hold
there.
5.
Set the lock lever to LOCK position (L).
6.
Check nitrogen gas charge pressure in accumulator within 15 seconds according to the following proce-
dure.
When the engine is stopped, the pressure in the accumulator gradually goes down, so this inspection can
be performed only immediately after the engine is stopped.
1) Turn the starting switch to OFF position (A) to stop the
engine.
Hold the work equipment in the maximum reach pos-
ture (arm fully out, bucket fully dumped).
MAINTENANCE
MAINTENANCE PROCEDURE
4-63
WENAM00150
Содержание PC30MR-5
Страница 2: ......
Страница 66: ...WENAM00150 ...
Страница 69: ... 14 Engine rear cover 15 Cooling cover 16 Battery OPERATION GENERAL VIEW 3 3 WENAM00150 ...
Страница 257: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00150 ...
Страница 324: ...The accumulator is installed to the position shown in the figure MAINTENANCE PROCEDURE MAINTENANCE 4 68 WENAM00150 ...
Страница 325: ...SPECIFICATIONS 5 1 WENAM00150 ...
Страница 363: ...REPLACEMENT PARTS 7 1 WENAM00150 ...
Страница 370: ...WENAM00150 ...
Страница 379: ......
Страница 380: ......