2.
“Breaker Setting” screen is displayed.
Select the setting corresponding to the operation on
“Breaker Setting” screen, and then press function switch
“F4”.
Setting of B mode is changed.
On “Breaker Setting” screen, you can perform the following
operations with function switches “F1” to “F4”, “F6”, and
“F7”.
Function switch “F1”
Moves to the next item (1 line below).
When on the last line, it moves to the first line.
Function switch “F2”
Moves to the previous item (1 line above).
When on the first line, it moves to the last line.
Function switch “F3”
Cancels the selection and returns the screen to “Machine Setting” menu screen.
Function switch “F4”
Allocates the selected setting to the setting when B mode is selected.
Function switch “F6”
Changes the flow rate of the selected breaker setting.
Function switch “F7”
Changes the name of the selected breaker setting.
Changing the Breaker Setting name
Change the name of breaker setting after starting the engine.
You can change the name of each pattern for the breaker setting as you like.
You can use alphabet letters (A to Z), Arabic numerals (0 to 9), symbols (#, *, +, -, and /), and the blank (space).
1.
Select the breaker setting to change its name on “Breaker
Setting” screen, and then press function switch “F7”.
2.
The “Breaker Name Setting” screen is displayed.
On “Breaker Name Setting” screen, you can perform the
following operations with function switches “F1” to “F4”,
“F6”, “F7”, and “F8”.
Function switch “F1”
Moves to the previous alphabet, numeral, or symbol.
Function switch “F2”
Moves to the next alphabet, numeral, or symbol.
Function switch “F3”
Returns the screen to “Breaker Setting” screen without changing the name.
EXPLANATION OF COMPONENTS
OPERATION
3-38
WENAM00150
Содержание PC30MR-5
Страница 2: ......
Страница 66: ...WENAM00150 ...
Страница 69: ... 14 Engine rear cover 15 Cooling cover 16 Battery OPERATION GENERAL VIEW 3 3 WENAM00150 ...
Страница 257: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00150 ...
Страница 324: ...The accumulator is installed to the position shown in the figure MAINTENANCE PROCEDURE MAINTENANCE 4 68 WENAM00150 ...
Страница 325: ...SPECIFICATIONS 5 1 WENAM00150 ...
Страница 363: ...REPLACEMENT PARTS 7 1 WENAM00150 ...
Страница 370: ...WENAM00150 ...
Страница 379: ......
Страница 380: ......