PC35MR-5 Long arm
PC35MR-5 Quick coupler and 3rd attachment line (cab specification)
METHOD FOR REPLACING BUCKET
k
k
WARNING
• When pins are knocked in with a hammer, pieces of metal may fly and cause serious injury.
When performing this operation, always wear protective eyeglasses, helmet, gloves, and other pro-
tective equipment.
• Place the removed bucket in a stable condition.
• The pin is hit with a strong force to remove, so the pin may fly out and injure the near people. Pay
attention to the area around the machine.
• Do not stand behind the bucket, and do not put your foot on the side of the bucket when removing
the pins.
• Do not to get your fingers caught when removing or inserting pins.
• Never insert your fingers into the pin holes when aligning the holes.
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-145
WENAM00150
Содержание PC30MR-5
Страница 2: ......
Страница 66: ...WENAM00150 ...
Страница 69: ... 14 Engine rear cover 15 Cooling cover 16 Battery OPERATION GENERAL VIEW 3 3 WENAM00150 ...
Страница 257: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 WENAM00150 ...
Страница 324: ...The accumulator is installed to the position shown in the figure MAINTENANCE PROCEDURE MAINTENANCE 4 68 WENAM00150 ...
Страница 325: ...SPECIFICATIONS 5 1 WENAM00150 ...
Страница 363: ...REPLACEMENT PARTS 7 1 WENAM00150 ...
Страница 370: ...WENAM00150 ...
Страница 379: ......
Страница 380: ......