Control and operation
Initial starting after out of service period
4.5 Initial starting after out of service period
4.5.1 Preparation of initial starting
For initial starting or after a suspension of activity, perform the following tasks:
u
Replace engine oil. Refer to chapter Maintenance.
u
Replace oil filters. Refer to chapter Maintenance.
u
Perform a general visual inspection. Refer to chapter Maintenance.
u
Check coolant level. Refer to chapter Maintenance.
u
Drain off water and sediment of fuel tank. Refer to Operation and Maintenance Manual.
u
Check water separator of fuel pre-filter and bleed water if necessary. Refer to Operation and
Maintenance Manual.
u
Check visually the starter, battery charging alternator.
u
Check belt, and replace if necessary. Refer to chapter Maintenance.
u
Vent the fuel system. Refer to Operation and Maintenance Manual of generator set.
KD62V12 33521030301_8_1 EN_US 2022-09
© 2022 by Kohler Co. All rights reserved.
75
Содержание KD62V12
Страница 6: ...6 2022 by Kohler Co All rights reserved KD62V12 33521030301_8_1 EN_US 2022 09...
Страница 8: ...8 2022 by Kohler Co All rights reserved KD62V12 33521030301_8_1 EN_US 2022 09...
Страница 163: ...Operating faults Faults Cause Remedy KD62V12 33521030301_8_1 EN_US 2022 09 2022 by Kohler Co All rights reserved 163...
Страница 210: ...33521030301_8_1 EN_US 2022 09 LHID12566146 2022 by Kohler Co All rights reserved...