Maintenance
Post maintenance activities
Painting
u
Shake the spray paint can for 3 minutes.
u
Spray the paint at a distance of 25 cm (9.84 in) to 30 cm (11.81 in), making a criss-cross
pattern.
u
Spray enough layers to cover the whole unpainted area.
u
Turn the spray can upside down and bleed the valve after finishing the paint work.
Information
In optimal conditions (20 °C (68 °F), 65% of humidity), the paint is completely dry after 24 hours.
100
© 2022 by Kohler Co. All rights reserved.
KD62V12 33521030301_8_1 EN_US 2022-09
Содержание KD62V12
Страница 6: ...6 2022 by Kohler Co All rights reserved KD62V12 33521030301_8_1 EN_US 2022 09...
Страница 8: ...8 2022 by Kohler Co All rights reserved KD62V12 33521030301_8_1 EN_US 2022 09...
Страница 163: ...Operating faults Faults Cause Remedy KD62V12 33521030301_8_1 EN_US 2022 09 2022 by Kohler Co All rights reserved 163...
Страница 210: ...33521030301_8_1 EN_US 2022 09 LHID12566146 2022 by Kohler Co All rights reserved...