Rough-in preparation
Complete rough-in wiring at each location before mounting an AppStat. This
includes the following steps.
Install the supplied mounting base directly to a wall, a vertical electrical
box, or a box with a wall plate kit.
Routing the connecting cable or cables from the AppStat to the
equipment it is controlling.
If required, install an appropriate wall plate kit.
Block leaks and airflow from conduits with plumber’s putty or similar
material.
If replacing an existing thermostat, label existing wires for reference
when removing the existing thermostat.
Illustration 2–2 AppStat mounting base details
A
5.12 in.
130 mm
3.50 in.
89 mm
Input
s and
network
Power and output
s
Installing the AppStat
To install the controller on a mounting base, do the following:
1. Turn the Allen screw in the base of the sensor clockwise until it clears
the case.
Turn clockwise to remove
from base.
2. Swing the AppStat away from the mounting base to remove it.
3. Route wiring for the AppStat through the mounting base.
Installation, Operation, and Application Guide for AppStat
Section 2: Installing the AppStat
Revision G
19
Содержание BAC-4000 series
Страница 6: ...Contents KMC Controls Inc 6 Revision G ...
Страница 30: ...Section 2 Installing the AppStat KMC Controls Inc 30 Revision G ...
Страница 64: ...Section 4 Commissioning functions KMC Controls Inc 64 Revision G ...
Страница 112: ...Section 6 Application drawings KMC Controls Inc 112 Revision G ...
Страница 124: ...Section 7 System integration KMC Controls Inc 124 Revision G ...
Страница 128: ...power 28 roof top unit 98 rough in 18 Index KMC Controls Inc 128 Revision G ...