Adjustments and Minor Repairs
© MMXXI Kirby Morgan Dive Systems, Inc. All rights reserved. Document # 210902001
43
8. Using tie wrap tool or equivalent,
install new tie wrap to secure Purge
Tube in place on pod skirt.
Tilt to Purge Valve P/N 805-047
1.
Cut tie wrap, and remove tilt-to-purge valve assembly.
2. Push on the outside of the pod skirt to unseat the water dump valve
body and valve. The two components will be removed as one unit inside
the pod skirt. Do not attempt to push the valve body out through the
tube of the pod skirt.
3. Clean using a soft bristle brush and cleaning solution on the exterior
surfaces of assembly. Place in ultrasonic cleaner using cleaning solution
for 10 minutes. Re-clean with soft bristle brush if needed.
4. Inspect component for damage. Replace if needed.
5. Install the water dump valve
body and valve back into the
pod skirt as one unit. Verify cor-
rect orientation of the valve and
seating into skirt tube.
NOTE
Valve orientation allows breathing gas and water to exit the pod
when installed correctly.
6. Install tilt-to-purge valve assembly so that the assembly is flush with
tube end on rubber skirt of pod.
7. Using tie wrap tool or equivalent, install new tie wrap P/N 520-038 to
secure tilt-to- purge valve assembly in place on pod skirt.
Содержание M-48 SuperMask
Страница 47: ...This page intentionally left blank ...
Страница 55: ...This page intentionally left blank ...