
16-10-200716-10-2007
MKIV OPERATOR’S MANUAL
31
Issue each of the following commands in turn, followed by Enter, and wait for the Main Menu to
return before going to the next command.
PN: routes all printing to the line printer
TE:
confirms that the printer is ON
RL:
prints the firmware error log
PO:
prints instrument constants
RE:
initializes and resets the Brewer
RL:
prints the firmware error log
SR:
* performs an Azimuth Tracker steps/revolution test
AP:
* prints A/D monitor values
HG:
* wavelength calibration (takes about 7 minutes)
SL:
* standard lamp test (takes about 8 minutes)
RS:
* run stop /test (takes about 8 minutes)
DT:
* dead time test (takes about 8 minutes)
FR:
* resets micrometers
HG:
mercury lamp calibration
Compare the results of the tests marked “
*
” with those in the FINAL TEST RECORD and
consult KIPP & ZONEN if there are any discrepancies or problems noted in the tests.
3.10
FINAL INSTALLATION
If the results of the initial tests are within acceptable tolerances, then the Brewer can be moved to
its final location.
1.
At the Brewer Main Menu, issue the command, EX, and the Brewer Operating Program will
terminate.
2.
Turn OFF all Brewer and Computer equipment and remove all interconnecting cables.
3.
Route the Power and Data Cables from the Computer to the Brewer final location.
4.
Disassemble the Brewer-Tracker-Tripod setup , and move them to the final location.
5
At the final location, place the Tripod on a flat surface such that one leg points approximately
toward geographic North.
6.
Use the Tripod “tie-down kit” to secure the tripod against movement due to accidental
bumping or high winds. See Figure 3.6.
Figure 3.6: Securing the Tripod
3. BREWER SYSTEM SETUP
Содержание BREWER MK IV
Страница 1: ...INSTRUCTION MANUAL OM BA C230 B Mk IV...
Страница 2: ...REVISION HISTORY REV DESCRIPTION DCN DATE APPD B Update 99 16 12 C Update 07 16 10...
Страница 3: ...ii...
Страница 5: ...2...
Страница 7: ...4...
Страница 25: ...MKIV OPERATOR S MANUAL 22...
Страница 27: ...MKIV OPERATOR S MANUAL 24 Figure 3 2 Brewer Equipment Setup Figure 3 3 Brewer Spectrophotometer Tracker Tripod...
Страница 57: ...MKIV OPERATOR S MANUAL 54...
Страница 61: ...MKIV OPERATOR S MANUAL 58...
Страница 81: ...MKIV OPERATOR S MANUAL 78...
Страница 91: ...MKIV OPERATOR S MANUAL 88...
Страница 93: ...MKIV OPERATOR S MANUAL 90...
Страница 127: ...MKIV OPERATOR S MANUAL 124...
Страница 133: ...MKIV OPERATOR S MANUAL 130...
Страница 135: ...MKIV OPERATOR S MANUAL 132...