Beacon units - P.No. 1009254 (where applicable)
The Beacons provides an external visual indication which is used to indicate Failure & Service Reminders and
may be included in the Power and Pressure Failure Detection System (PPFDS). The beacon is provided with a
5m cable which can be extended to 30m. As supplied, the unit is protected against rain to IP65 and is supplied
ready to mount on a suitable surface. Complete wiring according to Figure 3 & Figure 4.
This unit is designed to be simple to install and safe in operation. Any modification may adversely affect its
weather resistance in operation. If in any doubt, please consult us for advice. This is a sealed unit and not
serviceable.
Installation of High-Level Alarm
–
HLA (where applicable)
Fix the black plastic bracket to the side wall of the baffle (the exact position is on the drawing included with
the HLA kit). Secure the float cable in the cable gland as shown on the drawing in the HLA kit. Pull the float
cable through any installed ducting into the blower housing. Complete wiring according to Figure 3 & Figure 4.
For Biotec, Bioficient or BioSafe Applications
7.7.1.
Power & Pressure Failure Detection System
–
PPFDS (where applicable)
The panel is designed to be used in conjunction with the Beacon unit to provide warning of either loss of
power or air pressure failure.
For panels mounted outside the blower housing, additional tubing can be purchased, contact your local sales
team for details. The panel can be mounted up to 30m away from the blower with no effect on the
performance of the pressure failure detection system.
To prevent damage to the PPFDS hole is fitted with a nylon bolt and nut. If the PPFDS is to be used, replace the
bolt with the air inlet bulkhead fitting supplied inside the control unit. A short length of 4mm silicone tubing
and a cable tie is also supplied. Connect the tubing from the bulkhead fitting to the
Top Port
of the pressure
switch, SW2, see Figure 5. Tie the cable tie on the pressure switch to prevent the tubing slipping off as it is not
barbed.
Figure 5 - Pressure switch tubing
For Biodisc Applications
Using a suitable M20 gland, feed the motor power supply cable through Gland Hole and terminate to
connections according to Figure 3 & Figure 4.
7.8.1.
Installation of Sludge Return Pump (where applicable)
Using a suitable M20 gland, feed the integral discharge pump power cable through Gland Hole and terminate
to connection according to Figure 3 & Figure 4.