background image

 

1011026 User Manual Issue 01 (26.10.2021) 

 

 

 

Detailed Operation 

Once the initialisation is complete the operating screen will appear as follow. Page 1 to 6 can be navigated 
using 

 & 

 key.   

 

Figure 8 Main Screen Page 1 

 

Figure 9 Main Screen Page 2 

Page 3 to 6 are like the above, for Motor / Blower & Chemical Dosing Pump.  
Press down key to show the date and time when the next service is due.  
If only the pin is used this will show an upcoming date. If not activated, this will show a 2021 date.  

 

Figure 10 Next Service Due 

Press down arrow again to return to the initial screen showing the now activation time. 

 

Alarms 

The conditions shown below cause an alarm message to appear on the display, the beeper sounds, the beacon 
flashes, and the common alarm telemetry relay is de-energised. Some alarm conditions are recorded in the 
event log, along with the date and time. The display will cycle through messages if multiple alarms exist at the 
same time. The alarm message(s) will disappear when the alarm condition(s) have been cleared. 

 

Mains failure 

 

Low battery 

 

Loss of rotation 

 

High level float probe 

 

Auxiliary input 

 

Blower pressure 

 

Pumped outlet fuse 

 

De-sludge pump fuse 

 

Motor/blower fuse 

 

Chemical dosing pump fuse 

 

Service due 

The 

beeper can be muted by pressing the ‘

 

’ button.

 The beeper will sound again after 

SIX HOURS

 if any 

alarm condition still exists. 

 

 

 

 Date  2022-05-17             
 Time  13:14:15   

Содержание Klargester 1002510

Страница 1: ...Kingspan Klargester 1011026 Domestic Wastewater Control Panel USER MANUAL...

Страница 2: ...Installation of High Level Alarm HLA where applicable 6 Beacon units P No 1009254 where applicable 7 Installation of High Level Alarm HLA where applicable 7 For Biotec Bioficient or BioSafe Applicati...

Страница 3: ...of Practice Statutory Requirements and any specific instructions issued by the supplier of these details Earthing All equipment must be earth bonded in accordance with the latest IEE Wiring Regulation...

Страница 4: ...1011026 User Manual Issue 01 26 10 2021 4 7 Installation Figure 1 1002510 Lid Cover Figure 2 Enclosure Mounting Dimensions Figure 3 Control Panel Wiring 1...

Страница 5: ...1011026 User Manual Issue 01 26 10 2021 5 Figure 4 DTP Control Panel Wiring 2...

Страница 6: ...tape at a depth of 150mm For loads up to 0 75kW and runs of less than 100 metres 2 5mm 3 core SWA is adequate For loads up to 1 55kW and runs of less than 100 metres 4 0mm 3 core SWA should be used I...

Страница 7: ...Applications 7 7 1 Power Pressure Failure Detection System PPFDS where applicable The panel is designed to be used in conjunction with the Beacon unit to provide warning of either loss of power or ai...

Страница 8: ...te socket below the battery on the PCB marked J3 After finishing wiring replace the isolator cover and screw Turn the mains supply on at the source Turn on the panel using the isolation switch It shou...

Страница 9: ...vation time Alarms The conditions shown below cause an alarm message to appear on the display the beeper sounds the beacon flashes and the common alarm telemetry relay is de energised Some alarm condi...

Страница 10: ...factory defaults This menu is intended for use by installation Service engineers only The menu is entered by simultaneously pressing then releasing the three buttons On entry to the menu all outputs...

Страница 11: ...4 hour format The display will show Figure 13 Date Time Use and to move between date and time Pressing the button will freeze display of the clock and enter edit mode to allow the date or time to be s...

Страница 12: ...ickle Charge indicates that the unit is fully charged and maintaining the battery 8 6 7 Factory Defaults This option allows the control unit to be set back to the defaults as they were when the unit l...

Страница 13: ...lower J9 Chemical dosing pump Grundfos KP 350 Grundfos KP 250 Secoh JDK 250 Kingspan 404390 Fusing F1 De sludge pump terminals 3 4 T 5A H 250V F2 Internal power supply unit T 2A H 250V F3 Motor blower...

Страница 14: ...y 16 x 2 character LCD Green power LED Real Time Clock Event log timestamps and controlling the operation of the motors blowers according to a timetable LED Beacon 1009254 Only the LED beacon 1009254...

Страница 15: ...ay Motor Blower Start Time Time of Day where Unit is started 00 00 00 Stop Time Time of Day where Unit is stopped 23 59 59 Run Time Time for the components to Run 23 59 59 24 hours Pause Time Time for...

Страница 16: ...1011026 User Manual Issue 01 26 10 2021 16 This Page Intentionally Left Blank...

Отзывы: