background image

07

DISCHARGE ARRANGEMENT

Position the inlet control group so that the discharge from 

both safety valves can be joined together via a 15mm end 

feed Tee (see diagram above). Connect the Tundish and 

route the discharge pipe. The discharge pipework must 

be routed in accordance with Part G3 of schedule 1 of the 

Building Regulations. The information that follows is not 

exhaustive and if you are in doubt you should seek advice. 

The two safety valves will only discharge water under fault 

conditions. When operating normally water will not be 

discharged. The tundish should be vertical, located in the 

same space as the unvented hot water storage system and 

be fitted as close as possible to, and lower than, the safety 

device, with no more than 600mm of pipe between the valve 

outlet and the tundish. The tundish should be positioned 

away from electrical devices.

Any Discharge should be visible at the tundish. The tundish 

should be located such that any discharge is visible. In 

addition, where discharges from safety devices may not 

be apparent, e.g. people with impaired vision or mobility, 

consideration should be given to the installation of a suitable 

safety device to warn when discharge takes place, e.g. 

electronically operated.

Diagram of a typical discharge pipe arrangement (extract from 
Building Regulation G3)

Note: The discharge will 
consist of scalding water and 
steam. Asphalt, roofing felt 
and non-metallic rainwater 
goods may be damaged by 
such discharges.

Note: D2 pipe from tundish 
is now allowed to be 
installed in soil stacks within 
premises. This activity is not 
recommended by Kingspan 
as discharge from T&P may 
continue for long periods 
of time. It is the installer’s 
responsibility to ensure the 
discharge pipework can 
support the discharge for 
prolonged periods. 
If used follow guidance on 
mechanical seal without 
water trap given in G3 
Building Regulations.
As discharge can be in 
excess of 90oC discharge 
into plastic pipework is also 
not recommended.

KINGSPAN ALBION
RELIABLE HOT WATER CYLINDERS

Содержание AUXD120

Страница 1: ...JANUARY 2017 PART NO 024458 ULTRASTEEL PLUS INSTALLATION AND MAINTENANCE INSTRUCTIONS...

Страница 2: ...be checked to ensure it can meet these requirements If necessary consult the local water company regarding the likely pressure and ow rate availability If measuring the water pressure note that a high...

Страница 3: ...centralheating co uk for more information IMPORTANT NOTE TO THE INSTALLER Read these instructions before commencing installation Unvented cylinders are a controlled service as de ned in the latest edi...

Страница 4: ...direct Models Immersion heater Spare Part No 021533 High Limit thermostat Spare Part No STATHIGHALT Two port valve Spare Part No VALVE2PORTH Acetal tundish 15 x 22 mm Spare Part No TUNDPL15ALT Tempera...

Страница 5: ...80 litre sizes there is no dedicated secondary return boss and the secondary return circuit should be tee d into the cold feed pipe just above the drain elbow SCHEMATIC DIAGRAM Access for maintenance...

Страница 6: ...not have to be drained down in order to service the inlet control set Ensure that the arrow points in the direction of the water ow Turn to test Cold Mains In Balanced Cold Connection Outlet to Cylin...

Страница 7: ...L PLUS can be used with secondary circulation An appropriate WRAS approved bronze circulator should be used in conjunction with a non return valve to prevent back ow On large secondary circulation sys...

Страница 8: ...he tundish should be located such that any discharge is visible In addition where discharges from safety devices may not be apparent e g people with impaired vision or mobility consideration should be...

Страница 9: ...above external surfaces such as car parks hard standings grassed areas etc are acceptable providing that where children play or otherwise come into contact with discharges a wire cage or similar guard...

Страница 10: ...989 NF L D 35 2832 AUXD210 209 1557 550 184 1087 244 832 1055 1022 L D 34 2876 AUXD250 247 1802 550 184 1332 244 972 1300 1267 XL D 36 4548 AUXD300 297 2072 550 184 1584 244 1123 1552 1519 XL D 36 456...

Страница 11: ...N180 27 16 88 1 AUXN210 31 17 08 1 AUXN250 33 20 31 2 AUXN300 42 19 61 2 Boss centre from oor ErP Code Capacity Ltrs Height mm Dia mm A mm B mm C1 mm C2 mm D mm E mm F mm ErP Rating Standing Loss W AU...

Страница 12: ...temperature high limit cut out provided Iinto dry stat pocket G2 to ensure the heat input to the solar coil is interrupted if the cylinder overheats Some method to prevent thermosyphoning must also b...

Страница 13: ...umbered accordingly Where an alternative is supplied connect as per manufacturer s instructions 0 3040 65 963 4HPU Z Z WWS KV ISL WVSL M ZLK ZW Y HTW 3 5 3 6 9 A65 3 3 6 9 A65 3 3 5 7 47 0 3040 65 963...

Страница 14: ...3T 2T 1T N Danfoss TP5000 L E 1 2 3 2B 4B N 9B E DHW ZONE BLUE BR BL GR OR G Y 2B 5B N 9B E HTG ZONE 1 RED BR BL GR OR G Y THERMOSTAT 7B COMMON 8B 2 4B 1 PUMP CONNECTOR BL BR G Y N 3B E E 15B 2B 6B N...

Страница 15: ...robes will inserted into the thermostat pockets on the immersion heater The immersion heater thermostat probes should alway be inserted in the upper thermostat pocket on the immersion heater and the p...

Страница 16: ...ing Pressure 8 0 Bar Opening Pressure of T P Valve 10 0 Bar Opening Temperature of T P Valve 90o C Maximum Pressure on Primary Circuit Indirect Solar Coil 3 5 Bar Element Rating 3kW 240 V Fuse Require...

Страница 17: ...N A N A N A N A N A D XL 36 4548 AUXD300 55 355 297 N A N A N A N A N A D XL 36 4567 ULTRASTEEL PLUS INDIRECT AUXN120 35 155 119 N A 3 3 0 67 N A N A B 49 AUXN150 40 190 149 N A 3 77 0 77 N A N A B 5...

Страница 18: ...sion heater and the temperature and pressure relief valve Before lling open the hot tap furthest away from the ULTRASTEEL PLUS to let air out Open the cold main isolation valve and allow the unit to l...

Страница 19: ...inder With cylinder cold check pressure in cylinder If this is the same as the incoming mains pressure then you are getting backfeed Install a balanced cold supply see page 6 Follow recharge steps on...

Страница 20: ...r is hot turn the boiler and or the immersion heater off Do not turn off the water until the discharge runs cool The discharge may also stop CALL OUT A COMPETENT PLUMBER TO SERVICE THE UNIT Tell them...

Страница 21: ...rol set d voume is now recharged d W Z Both immersion heater control and boiler heat control thermostats should have been set during is required the the thermostat cover will need to be removed K EKd...

Страница 22: ...he unit from the cold mains Attach a hose to the draining tap ensuring that it reaches to a level below the unit this will ensure an ef cient syphon is set up and the maximum amount of water is draine...

Страница 23: ...e back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally...

Страница 24: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Страница 25: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 26: ...seek evidence of this maintenance to our reasonable satisfaction before approving any guarantee servicing repairs This may include evidence of completed BenchmarkTM log book and service agreement invo...

Страница 27: ...ufacturer shall be responsible for any consequential damage howsoever caused The effects of scale build up or the effects of corrosion Any consequential losses caused by the failure or malfunction of...

Страница 28: ...ild Date To be completed by the home owner Please use this card to register within 30 days of commissioning occupation if new build to bene t from the Kingspan Environmental 2 year guarantee By comple...

Отзывы: