background image

KINGSPAN ALBION
RELIABLE HOT WATER CYLINDERS

17

GENERAL

Servicing should only be carried out by competent installers 
and any spare parts used must be 

Kingspan

 approved. NEVER 

bypass any safety devices or operate the unit without them 
being fully operational.

DRAINING

Isolate from the electrical supply to prevent the immersion 
heaters burning out. Turn off the boiler. Isolate the unit from 
the cold mains. Attach a hose to the draining tap ensuring that 
it reaches to a level below the unit (this will ensure an efficient 
syphon is set up and the maximum amount of water is drained 
from the unit). First open the hot tap closest to the unit and 
then open the draining tap. 

WARNING: WATER DRAINED OFF MAY BE VERY HOT!

IMPORTANT: After draining the cylinder do not close the hot 
tap until the cylinder has fully cooled, failure to follow this 
instruction may result in damage to the cylinder and will 
invalidate the guarantee.

ANNUAL MAINTENANCE

ULTRASTEEL PLUS requires an annual service in order to 
ensure safe working and optimum performance. It is essential 
that the following checks are performed by a competent 
installer 

on an annual basis. Commonly this is done at the same time 
as the annual boiler service.

1)

Twist the cap of the expansion relief valve on the inlet

 

control set and allow water to flow for 5 seconds. Release

 

and 

make sure it resets correctly. Repeat with the pressure
/ temperature relief valve. In both cases check that the

 

discharge pipework is carrying the water away adequately. If

 

not, check for blockages etc. and clear.
WARNING: THE WATER DISCHARGED MAY BE VERY HOT!

2) 

Check that any immersion heaters fitted are working

 

correctly and that they are controlling the water at a

 

temperature between 55°C and 65°C.

3) 

Recharge the expansion space by following the instructions

 

on page H1. Turn off the water supply to the unit and open a

 

hot tap and drop the pres

s

ure in the cylinder. Hold open T&P

 

valve until flow stops. Release T&P valve and turn water sup

p

ly

 

back on. When water flows from hot tap turn tap off. Check for

 

any leaks.

4) 

Unscrew the head on the inlet control set and clean the

 

mesh filter within.

5) 

The Benchmark Log Book supplied with this unit should be

 

updated at each service.

YOUR GUARANTEE MAY BE VOID WITHOUT PROOF OF

 

ANNUAL SERVICING. 

SERVICING

FLUSHING & FILLING

Check all the connections for tightness including any factory 
made connections such as the immersion heater and the 
temperature and pressure relief valve. Before filling, open 
the hot tap furthest away from the ULTRASTEEL PLUS to 
let air out. Open the cold main isolation valve and allow the 
unit to fill. When water flows from the tap allow it to run for 
a short while to flush through any dirt, swarf or flux residue. 
Close the tap and open every other hot tap in turn to purge 
all remaining air.

DIRECT UNITS

After filling with water and after sterilisation liquid has 
been purged, switch on the power to the immersion heaters 
and allow the unit to start to heat. The immersion heater 
is supplied preset at 55°C. Turning fully to + sets to approx 
65°C. Allow unit to heat up, adjust the thermostat so that 
the heater switches off at 60°C. Record information on 
commissioning check list (Page 26). 

INDIRECT UNITS

Consult the boiler manufacturer’s commissioning 
instructions and fill the primary circuit. Ensure the lever on 
the two port valve is set to the filling position. When full, 
move the lever back. Switch the programmer to Domestic 
Hot Water (DHW) and allow the unit to start to heat. Adjust 
the dial of the dual thermostat to between 55°C and 65°C 
as required. Allow unit to heat up, adjust the thermostat so 
that the heater switches off at 60°C. Record information on 
commissioning check list (Page 26).

STORAGE TEMPERATURE

The recommended storage temperature for both direct 
and indirect cylinders is 60-65°C. In hard water areas 
consideration should be given to reducing this to 50-55°C. 
In many healthcare applications the guidance on Legionella 
control and safe water delivery temperatures will require 
storing the water at 60-65°C, distributing at 50- 55°C 
and using thermostatic mixing valves to control the final 
temperature. For details consult the NHS Estates Guidance 
on safe hot water temperatures.

SAFETY VALVE CHECKS

During heat-up there should have been no sign of water 
coming from either the expansion relief valve or the 
temperature/pressure relief valve. Now hold both of these 
safety valves fully open, allowing as much water as possible 
to flow through the tundish. Check that your discharge 
pipework is free from debris and is carrying the water away 
to waste efficiently. Release the valves and check that they 
reseat properly. On Completion of commissioning, fill in the 
Benchmark check list and leave with the house owner.

BENCHMARK SCHEME

The installer must follow the Benchmark code of practice for 
the Benchmark certification to be valid. The benchmark code 
of practice can be found on the internet using the following 
internet site www.centralheating.co.uk and follow links.

COMMISSIONING

Содержание AUXD120

Страница 1: ...JANUARY 2017 PART NO 024458 ULTRASTEEL PLUS INSTALLATION AND MAINTENANCE INSTRUCTIONS...

Страница 2: ...be checked to ensure it can meet these requirements If necessary consult the local water company regarding the likely pressure and ow rate availability If measuring the water pressure note that a high...

Страница 3: ...centralheating co uk for more information IMPORTANT NOTE TO THE INSTALLER Read these instructions before commencing installation Unvented cylinders are a controlled service as de ned in the latest edi...

Страница 4: ...direct Models Immersion heater Spare Part No 021533 High Limit thermostat Spare Part No STATHIGHALT Two port valve Spare Part No VALVE2PORTH Acetal tundish 15 x 22 mm Spare Part No TUNDPL15ALT Tempera...

Страница 5: ...80 litre sizes there is no dedicated secondary return boss and the secondary return circuit should be tee d into the cold feed pipe just above the drain elbow SCHEMATIC DIAGRAM Access for maintenance...

Страница 6: ...not have to be drained down in order to service the inlet control set Ensure that the arrow points in the direction of the water ow Turn to test Cold Mains In Balanced Cold Connection Outlet to Cylin...

Страница 7: ...L PLUS can be used with secondary circulation An appropriate WRAS approved bronze circulator should be used in conjunction with a non return valve to prevent back ow On large secondary circulation sys...

Страница 8: ...he tundish should be located such that any discharge is visible In addition where discharges from safety devices may not be apparent e g people with impaired vision or mobility consideration should be...

Страница 9: ...above external surfaces such as car parks hard standings grassed areas etc are acceptable providing that where children play or otherwise come into contact with discharges a wire cage or similar guard...

Страница 10: ...989 NF L D 35 2832 AUXD210 209 1557 550 184 1087 244 832 1055 1022 L D 34 2876 AUXD250 247 1802 550 184 1332 244 972 1300 1267 XL D 36 4548 AUXD300 297 2072 550 184 1584 244 1123 1552 1519 XL D 36 456...

Страница 11: ...N180 27 16 88 1 AUXN210 31 17 08 1 AUXN250 33 20 31 2 AUXN300 42 19 61 2 Boss centre from oor ErP Code Capacity Ltrs Height mm Dia mm A mm B mm C1 mm C2 mm D mm E mm F mm ErP Rating Standing Loss W AU...

Страница 12: ...temperature high limit cut out provided Iinto dry stat pocket G2 to ensure the heat input to the solar coil is interrupted if the cylinder overheats Some method to prevent thermosyphoning must also b...

Страница 13: ...umbered accordingly Where an alternative is supplied connect as per manufacturer s instructions 0 3040 65 963 4HPU Z Z WWS KV ISL WVSL M ZLK ZW Y HTW 3 5 3 6 9 A65 3 3 6 9 A65 3 3 5 7 47 0 3040 65 963...

Страница 14: ...3T 2T 1T N Danfoss TP5000 L E 1 2 3 2B 4B N 9B E DHW ZONE BLUE BR BL GR OR G Y 2B 5B N 9B E HTG ZONE 1 RED BR BL GR OR G Y THERMOSTAT 7B COMMON 8B 2 4B 1 PUMP CONNECTOR BL BR G Y N 3B E E 15B 2B 6B N...

Страница 15: ...robes will inserted into the thermostat pockets on the immersion heater The immersion heater thermostat probes should alway be inserted in the upper thermostat pocket on the immersion heater and the p...

Страница 16: ...ing Pressure 8 0 Bar Opening Pressure of T P Valve 10 0 Bar Opening Temperature of T P Valve 90o C Maximum Pressure on Primary Circuit Indirect Solar Coil 3 5 Bar Element Rating 3kW 240 V Fuse Require...

Страница 17: ...N A N A N A N A N A D XL 36 4548 AUXD300 55 355 297 N A N A N A N A N A D XL 36 4567 ULTRASTEEL PLUS INDIRECT AUXN120 35 155 119 N A 3 3 0 67 N A N A B 49 AUXN150 40 190 149 N A 3 77 0 77 N A N A B 5...

Страница 18: ...sion heater and the temperature and pressure relief valve Before lling open the hot tap furthest away from the ULTRASTEEL PLUS to let air out Open the cold main isolation valve and allow the unit to l...

Страница 19: ...inder With cylinder cold check pressure in cylinder If this is the same as the incoming mains pressure then you are getting backfeed Install a balanced cold supply see page 6 Follow recharge steps on...

Страница 20: ...r is hot turn the boiler and or the immersion heater off Do not turn off the water until the discharge runs cool The discharge may also stop CALL OUT A COMPETENT PLUMBER TO SERVICE THE UNIT Tell them...

Страница 21: ...rol set d voume is now recharged d W Z Both immersion heater control and boiler heat control thermostats should have been set during is required the the thermostat cover will need to be removed K EKd...

Страница 22: ...he unit from the cold mains Attach a hose to the draining tap ensuring that it reaches to a level below the unit this will ensure an ef cient syphon is set up and the maximum amount of water is draine...

Страница 23: ...e back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally...

Страница 24: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Страница 25: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 26: ...seek evidence of this maintenance to our reasonable satisfaction before approving any guarantee servicing repairs This may include evidence of completed BenchmarkTM log book and service agreement invo...

Страница 27: ...ufacturer shall be responsible for any consequential damage howsoever caused The effects of scale build up or the effects of corrosion Any consequential losses caused by the failure or malfunction of...

Страница 28: ...ild Date To be completed by the home owner Please use this card to register within 30 days of commissioning occupation if new build to bene t from the Kingspan Environmental 2 year guarantee By comple...

Отзывы: