MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST

*

 All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.  
A Building Regulations Compliance Certificate will then be issued to the customer.  

©Heating and Hotwater Industry Council (HHIC)   

 

 

 

              www.centralheating.co.uk

ALL SYSTEMS PRIMARY SETTINGS

 (indirect heating only) 

Is the primary circuit a sealed or open vented system? 

Sealed 

  Open 

 

What is the maximum primary flow temperature? 

 

°C

ALL SYSTEMS 

What is the incoming static cold water pressure at the inlet to the system? 

 

bar

Has a strainer been cleaned of installation debris (if fitted)? 

Yes 

  No 

Is the installation in a hard water area (above 200ppm)? 

Yes 

  No 

If yes, has a water scale reducer been fitted? 

Yes 

  No 

What type of scale reducer has been fitted? 

What is the hot water thermostat set temperature? 

 

°C

What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? 

  

l/min

Time and temperature controls have been fitted in compliance with Part L of the Building Regulations? 

 

Yes 

 

Type of control system (if applicable) 

Y Plan 

 

S Plan 

 

Other 

 

Is the cylinder solar (or other renewable) compatible? 

Yes 

  No 

What is the hot water temperature at the nearest outlet? 

 

°C

All appropriate pipes have been insulated up to 1 metre or the point where they become concealed 

 

Yes 

 

UNVENTED SYSTEMS ONLY 

Where is the pressure reducing valve situated (if fitted)?

What is the pressure reducing valve setting?  

 

bar

Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested? 

Yes 

  No 

The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations 

 

Yes 

Are all energy sources fitted with a cut out device? 

Yes 

  No 

Has the expansion vessel or internal air space been checked? 

Yes 

  No 

THERMAL STORES ONLY 

What store temperature is achievable? 

 

°C

What is the maximum hot water temperature? 

 

°C

ALL INSTALLATIONS 

 

The hot water system complies with the appropriate Building Regulations 

Yes 

 

The system has been installed and commissioned in accordance with the manufacturer’s instructions 

Yes 

 

The system controls have been demonstrated to and understood by the customer 

Yes 

 

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer 

Yes 

 

Commissioning Engineer’s Signature

Customer’s Signature

(To confirm satisfactory demonstration and receipt of manufacturer’s literature)

This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of 
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.  

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.      

Customer Name  

Telephone Number

Address 

Cylinder Make and Model 

Cylinder Serial Number 

Commissioned by 

(print name)

 

Registered Operative ID Number

Company Name 

Telephone Number

Company Address

 

 

Commissioning Date 

To be completed by the customer on receipt of a Building Regulations Compliance Certificate

*

:

Building Regulations Notification Number 

(if applicable)

Содержание AUXD120

Страница 1: ...JANUARY 2017 PART NO 024458 ULTRASTEEL PLUS INSTALLATION AND MAINTENANCE INSTRUCTIONS...

Страница 2: ...be checked to ensure it can meet these requirements If necessary consult the local water company regarding the likely pressure and ow rate availability If measuring the water pressure note that a high...

Страница 3: ...centralheating co uk for more information IMPORTANT NOTE TO THE INSTALLER Read these instructions before commencing installation Unvented cylinders are a controlled service as de ned in the latest edi...

Страница 4: ...direct Models Immersion heater Spare Part No 021533 High Limit thermostat Spare Part No STATHIGHALT Two port valve Spare Part No VALVE2PORTH Acetal tundish 15 x 22 mm Spare Part No TUNDPL15ALT Tempera...

Страница 5: ...80 litre sizes there is no dedicated secondary return boss and the secondary return circuit should be tee d into the cold feed pipe just above the drain elbow SCHEMATIC DIAGRAM Access for maintenance...

Страница 6: ...not have to be drained down in order to service the inlet control set Ensure that the arrow points in the direction of the water ow Turn to test Cold Mains In Balanced Cold Connection Outlet to Cylin...

Страница 7: ...L PLUS can be used with secondary circulation An appropriate WRAS approved bronze circulator should be used in conjunction with a non return valve to prevent back ow On large secondary circulation sys...

Страница 8: ...he tundish should be located such that any discharge is visible In addition where discharges from safety devices may not be apparent e g people with impaired vision or mobility consideration should be...

Страница 9: ...above external surfaces such as car parks hard standings grassed areas etc are acceptable providing that where children play or otherwise come into contact with discharges a wire cage or similar guard...

Страница 10: ...989 NF L D 35 2832 AUXD210 209 1557 550 184 1087 244 832 1055 1022 L D 34 2876 AUXD250 247 1802 550 184 1332 244 972 1300 1267 XL D 36 4548 AUXD300 297 2072 550 184 1584 244 1123 1552 1519 XL D 36 456...

Страница 11: ...N180 27 16 88 1 AUXN210 31 17 08 1 AUXN250 33 20 31 2 AUXN300 42 19 61 2 Boss centre from oor ErP Code Capacity Ltrs Height mm Dia mm A mm B mm C1 mm C2 mm D mm E mm F mm ErP Rating Standing Loss W AU...

Страница 12: ...temperature high limit cut out provided Iinto dry stat pocket G2 to ensure the heat input to the solar coil is interrupted if the cylinder overheats Some method to prevent thermosyphoning must also b...

Страница 13: ...umbered accordingly Where an alternative is supplied connect as per manufacturer s instructions 0 3040 65 963 4HPU Z Z WWS KV ISL WVSL M ZLK ZW Y HTW 3 5 3 6 9 A65 3 3 6 9 A65 3 3 5 7 47 0 3040 65 963...

Страница 14: ...3T 2T 1T N Danfoss TP5000 L E 1 2 3 2B 4B N 9B E DHW ZONE BLUE BR BL GR OR G Y 2B 5B N 9B E HTG ZONE 1 RED BR BL GR OR G Y THERMOSTAT 7B COMMON 8B 2 4B 1 PUMP CONNECTOR BL BR G Y N 3B E E 15B 2B 6B N...

Страница 15: ...robes will inserted into the thermostat pockets on the immersion heater The immersion heater thermostat probes should alway be inserted in the upper thermostat pocket on the immersion heater and the p...

Страница 16: ...ing Pressure 8 0 Bar Opening Pressure of T P Valve 10 0 Bar Opening Temperature of T P Valve 90o C Maximum Pressure on Primary Circuit Indirect Solar Coil 3 5 Bar Element Rating 3kW 240 V Fuse Require...

Страница 17: ...N A N A N A N A N A D XL 36 4548 AUXD300 55 355 297 N A N A N A N A N A D XL 36 4567 ULTRASTEEL PLUS INDIRECT AUXN120 35 155 119 N A 3 3 0 67 N A N A B 49 AUXN150 40 190 149 N A 3 77 0 77 N A N A B 5...

Страница 18: ...sion heater and the temperature and pressure relief valve Before lling open the hot tap furthest away from the ULTRASTEEL PLUS to let air out Open the cold main isolation valve and allow the unit to l...

Страница 19: ...inder With cylinder cold check pressure in cylinder If this is the same as the incoming mains pressure then you are getting backfeed Install a balanced cold supply see page 6 Follow recharge steps on...

Страница 20: ...r is hot turn the boiler and or the immersion heater off Do not turn off the water until the discharge runs cool The discharge may also stop CALL OUT A COMPETENT PLUMBER TO SERVICE THE UNIT Tell them...

Страница 21: ...rol set d voume is now recharged d W Z Both immersion heater control and boiler heat control thermostats should have been set during is required the the thermostat cover will need to be removed K EKd...

Страница 22: ...he unit from the cold mains Attach a hose to the draining tap ensuring that it reaches to a level below the unit this will ensure an ef cient syphon is set up and the maximum amount of water is draine...

Страница 23: ...e back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally...

Страница 24: ...pressure relief valve and expansion valve been tted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes Are all...

Страница 25: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 26: ...seek evidence of this maintenance to our reasonable satisfaction before approving any guarantee servicing repairs This may include evidence of completed BenchmarkTM log book and service agreement invo...

Страница 27: ...ufacturer shall be responsible for any consequential damage howsoever caused The effects of scale build up or the effects of corrosion Any consequential losses caused by the failure or malfunction of...

Страница 28: ...ild Date To be completed by the home owner Please use this card to register within 30 days of commissioning occupation if new build to bene t from the Kingspan Environmental 2 year guarantee By comple...

Отзывы: