Keysight N5224A/25A Service Guide 7-15
Repair and Replacement Procedures
Removing and Replacing the A4–A17 Boards
Remember to connect any necessary cables to the bottom of the board
before reinstalling it. If replacing a doubler board, make sure the new
board has loads connected to the same ports as were used on the old
board. This may require moving a load from the old board to the new board
or removing the load from the new board.
When replacing the A5 or A10 source board, remove the semirigid cables
attached to the bottom of the old board and attach them to the bottom of
the new board. Be sure to orient these cables the same as they were on
the old board.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
The A4, A15, and A17 synthesizer boards will not perform correctly and
will cause the PNA to display errors until the Synthesizer Bandwidth
Adjustment and the EE Default Adjustment are completed, as per
.
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...