3-4 Keysight N5224A/25A Service Guide
Tests and Adjustments
Before You Begin
3-
Before You Begin
Before checking, verifying, or adjusting the analyzer, refer to the following
paragraphs to:
— make sure the operating environment is within its requirements
— make sure that proper electrostatic discharge (ESD) protection is provided
— make sure the analyzer has warmed up properly to achieve system stability
— review the principles of connector care
Verify the Operating Environment
Due to their operating specifications, the verification and calibration kit devices
determine the limits of your operating environment conditions. Open the
calibration and verification kits and place all the devices on top of the foam
inserts so they will reach room temperature. As the device dimensions change
with temperature, their electrical characteristics change as well.
It is necessary to keep the environmental levels within the following limits:
— Temperature: +23
°
C ± 3
°
C (Error-corrected temperature range)
Once the measurement calibration has been done, the ambient
temperature must be maintained to within
±
1
°
C of the calibration
temperature.
— Humidity: 0% to 95% at 40
°
C maximum, non-condensing
— Altitude: 0 to 4,600 meters (
≈
15,000 feet.)
Protect Against Electrostatic Discharge (ESD)
This is important. If not properly protected against, electrostatic discharge can
seriously damage your analyzer, resulting in costly repair.
to review where the
calibration stickers should be placed on the PNA.
To reduce the chance of electrostatic discharge, follow all of the
“Electrostatic Discharge Protection” on
, for all of the procedures in this chapter.
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...