7-38 Keysight N5224A/25A Service Guide
Repair and Replacement Procedures
Removing and Replacing the A29–A32 Receiver Couplers and Receiver Coupler
Mounting Brackets
7-
Removing and Replacing the A29–A32 Receiver Couplers and
Receiver Coupler Mounting Brackets
Tools Required
— T-6 TORX driver (torque to 4 in-lb or 0.45 N.m)
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-6
3.
Position the analyzer bottom side up.
4.
Disconnect three semirigid cables (item
①
) from the receiver coupler to be
replaced.
5.
Remove two screws (item
➁
) from the mounting bracket of the receiver
coupler to be replaced.
6.
Move the disconnected semirigid cables out of the way and lift the
receiver coupler mounting bracket, with the receiver coupler attached, out
of the analyzer. It may be necessary to loosen the connector at the other
end of some of the semirigid cables to allow them to be moved enough.
Do not overbend them.
7.
Remove four screws that attach the receiver coupler to the receiver
coupler mounting bracket, and remove the receiver coupler from the
bracket.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Torque all RF connectors to 10 in-lbs.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove assemblies but do not
over-bend them.
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...