Keysight N5224A/25A Service Guide 7-53
Repair and Replacement Procedures
Removing and Replacing the Front Panel LED Boards
Removing and Replacing the Front Panel LED Boards
Tools Required
— T-10 TORX driver (torque to 9 in-lb)
— T-20 TORX driver (torque to 21 in-lb)
— 5/16 inch open-end torque wrench (torque to 10 in-lb)
— 1 inch open-end torque wrench (torque to 72 in-lb or 8.15 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the test port couplers. Refer to
A33–A36 Test Port Couplers” on page 7-40
.
3.
Remove two screws (item
①
) from the LED board to be removed and
remove the LED board from the analyzer.
Replacement Procedure
1.
Reverse the order of the removal procedure.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove assemblies but do not
over-bend them.
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...