Keysight N5224A/25A Service Guide 3-11
Tests and Adjustments
Non-Standards Compliant Verification
Non-Standards Compliant Verification
To meet the criteria for non-standards compliant verification, perform the
preliminary checks and the performance tests while
stopping to troubleshoot.
Refer to
for test flow. Troubleshoot and repair the first problem
encountered without continuing to other tests. After you troubleshoot, repair,
and adjust, repeat the last failed portion and generate a new set of data.
Figure 3-2
Non–Standards Compliant Verification Flowchart
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...