DDR2(+LP) Compliance Testing Methods of Implementation
311
Command and Address Timing (CAT) Tests
17
tIH(derate), Address and Control Input Hold Time with Derating Support - Test Method of Im
-
plementation
The purpose of this test is to verify that the time interval from the address or control or
command/address (rising or falling edge) hold time to the associated clock crossing edge is within
the conformance limits as specified in the JEDEC specification.
Signals of Interest
Mode Supported: DDR2, LPDDR2
Signal cycle of interest: WRITE
Signal(s) of Interest:
• Address Signal OR Control Signal OR Command/Address
• Clock Signal
Signals required to perform the test on the oscilloscope:
• Address Signal OR Control Signal OR Command/Address
• Clock Signal
Test Definition Notes from the Specification
Table 219
Timing Parameters by Speed Grade (DDR2-400 and DDR2-533) & (DDR2-667 and DDR2-800)
Parameter
Symbol
DDR2-400
DDR2-533
Units
Specific Notes
Min
Max
Min
Max
Address and control input hold time
tIH(base)
475
x
375
x
ps
5,7,9,23
Parameter
Symbol
DDR2-667
DDR2-800
Units
Specific Notes
Min
Max
Min
Max
Address and control input hold time
tIS(base)
275
x
250
x
ps
5,7,9,23,29
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...