DDR2(+LP) Compliance Testing Methods of Implementation
339
Calibrating the Infiniium Oscilloscope and Probe
19
Probe Calibration
Connecting the Probe for Calibration
For the following procedure, refer to
below.
1 Connect BNC (male) to SMA (male) adaptor to the deskew fixture on the connector closest to the
yellow pincher.
2 Connect the 50
SMA terminator to the connector farthest from yellow pincher.
3 Connect the BNC side of the deskew fixture to the Aux Out BNC of the Infiniium oscilloscope.
4 Connect the probe to an oscilloscope channel.
5 To minimize the wear and tear on the probe head, it should be placed on a support to relieve the
strain on the probe head cables.
6 Push down the back side of the yellow pincher. Insert the probe head resistor lead underneath
the center of the yellow pincher and over the center conductor of the deskew fixture. The
negative probe head resistor lead or ground lead must be underneath the yellow pincher and
over one of the outside copper conductors (ground) of the deskew fixture. Make sure that the
probe head is approximately perpendicular to the deskew fixture.
7 Release the yellow pincher.
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...