DDR2(+LP) Compliance Testing Methods of Implementation
159
Differential Signals AC Input Parameters Tests
10
Measurement Algorithm
1 Acquire and split read and write bursts of the acquired signal. (See notes on DDR read/write
separation).
2 Take the first valid WRITE burst found.
3 Find all valid Strobe positive pulses in the burst. A valid Strobe positive pulse starts at the 0V
crossing on a valid Strobe rising edge (see notes on threshold) and ends at the 0V crossing on the
following valid Strobe falling edge (see notes on threshold).
4 For the first valid Strobe positive pulse, zoom in on the pulse so that it appears on the
oscilloscope’s display, and perform the V
TOP
measurement. Take the V
TOP
measurement result as
the V
IHdiff(DC)
value.
5 Continue the previous step for the rest of the valid Strobe positive pulse in the burst.
6 Determine the worst result from the set of V
IHdiff(DC)
measured.
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...