DDR2(+LP) Compliance Testing Methods of Implementation
243
Data Strobe Timing (DST) Tests
15
Measurement Algorithm
1 Acquire and split read and write burst of the acquired signal.
2 Take the first valid READ burst found.
3 Find the Strobe tHZEndPoint of this burst.
4 Find RL Clock edge (tDQSCK clock edge reference).
• Find all DQS rising middle crossing points in the burst.
• Find the first DQS rising edge by searching for the earliest rising crossing point in all of the
found DQS middle crossing points.
• Find the closest Clock-DQS (the Clock middle crossing point that is closest to the first DQS
rising edge).
• Find the RL Clock edge (tDQSCK clock edge reference) which is the Clock middle crossing
point immediately before the closest Clock-DQS to tDQSCK Delay (cycle). By default, tDQSCK
Delay is one cycle. For example, if tDQSCK Delay = 1 then the tDQSCK Clock point is the Clock
middle crossing point that is prior to the closest Clock-DQS. If tDQSCK Delay = 3 then the
tDQSCK Clock point is the Clock middle crossing point three clock cycles before the closest
Clock-DQS. tDQSCK Delay is configurable in the configuration page.
5 Define BL (bit length) to be the number of DQS middle crossing points.
6 Find “RL+BL/2” Clock edge (Clock rising middle crossing point that is BL/2 cycles after the RL
Clock edge.
7 Compare the Strobe tHZ end point to the “RL+BL/2” Clock edge as the test result.
Mathematically, the test result = Data tHZ end point - “RL+BL/2” Clock edge point.
8 Display the test result by going to the measurement location on the waveform and locate the
marker to Strobe tHZ end point and Clock middle cross point of the test result.
9 Compare the test result against the compliance test limit.
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...