DDR2(+LP) Compliance Testing Methods of Implementation
257
Data Timing Tests
16
Test Procedure
1 Start the automated test application as described in
“Preparing to Take Measurements"
2 Ensure that the RAM reliability test software is running on the computer system where the
DDR2/LPDDR2 Device Under Test (DUT) is attached. This software will perform test on all the
unused RAM on the system by producing repetitive burst of read-write data signals to the
DDR2/LPDDR2 memory.
3 Connect the differential solder-in probe head to the PUTs on the DDR2/LPDDR2 devices.
4 Connect the oscilloscope probes to any channels of the oscilloscope.
5 In the DDR2(+LP) Test application, click the Set Up tab.
6 Select the Speed Grade options. For Data Timing Tests, you can select any speed grade within
the selection: DDR2-400, DDR2-533, DDR2-667, DDR2-800, DDR2-1066. To select a LPDDR2
Speed Grade option (for tests that support LPDDR2), check the Low Power box.
7 Type in or select the Device Identifier as well as User Description from the drop-down list. Enter
your comments in the Comments text box.
8 Click the Select Tests tab and check the tests you want to run. Check the parent node or group to
check all the available tests within the group.
Figure 33
Selecting Data Timing Tests
Содержание D9020DDRC
Страница 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Страница 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 40: ...1 Installing the DDR2 Compliance Test Application 40 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 134: ...6 Single Ended Signals VIH VIL Data Mask Tests 118 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 158: ...9 Single Ended Signals Overshoot Undershoot Tests 142 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 186: ...10 Differential Signals AC Input Parameters Tests 170 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 342: ...17 Command and Address Timing CAT Tests 326 DDR2 LP Compliance Testing Methods of Implementation ...
Страница 366: ...19 Calibrating the Infiniium Oscilloscope and Probe 350 DDR2 LP Compliance Testing Methods of Implementation ...