
13
TK-5710
(
B
)
/5710H
(
B
)
2-2. Installing the KRK-5 rear panel onto the front
panel kit
The following steps apply to both the KCH-14 and
KCH-15.
1. Remove three screws (
z
) on the KRK-5 rear panel, then
remove the KRK-5 sub panel.
2. Insert the lead wire with connector (W102) of the KRK-5
into the connector (CN1) of the front panel kit (
x
).
3. Insert the lead wire with connector (W103) of the KRK-5
into the connector (CN3) of the front panel kit (
c
).
4. Make a slight cut in the end of the rubber cap (
v
).
5. Slide the lead wire of the connector wiring (
b
) through
the slit in the rubber cap (
n
).
6. Insert the rubber cap into the hole of the KRK-5 rear panel
(
m
).
7. Insert the connector (
,
) to the ACC connector (
.
) on the
KRK-5 sub panel as shown by the arrow (
/
).
8. Install the KRK-5 sub panel onto the sub panel of the front
panel kit (
Ω
).
9. Install the KRK-5 sub panel to the sub panel of the front
panel kit using four screws (
≈
).
10.Reinstall the KRK-5 rear panel using three screws
removed in step 1.
11.Use a wire band to secure the lead wire at the end of the
rubber cap (
ç
).
2-3. Control cable (KCT-22) connection (Fig. 2-3)
1. Insert one connector of the control cable to the
transceiver (with KRK-5) and the other to the display.
Connect the cable to the GND terminal with the screw
(
z
) supplied with the control cable.
2. Secure the one connector of the control cable to the KRK-
5 main panel with two screws (
x
) according to the
installation condition of the transceiver. Secure the
control cable to the KRK-5 main panel with the cable
fitting (J21-4354-04) and two screws (
c
) supplied with
the KRK-5.
3. Secure the other connector of the control cable to the
display with two screws (
v
) in the same way.
2-4. Display installation (Fig. 2-4)
1. Install the display with the angle bracket (J29-0648-03)
(
z
) and two screws (N08-0526-04) (
x
) supplied with the
KRK-5.
INSTALLATION
Fig. 2-1-2
2
3
Affix the sheet while
taking note of the position
of the three parts.
KRK-5 main panel
CN1
W102
Lead wire
Rubber
cap
Packing
Front panel kit
(Example : KCH-14)
KRK-5 sub panel
W103
CN3
2
9
7
3
8
4
5
6
12
13
12
11
10
1
3
1
IGN,
GND etc.
IGN,GND etc.
Sub panel
Make
a cut
KRK-5 rear panel
Fig. 2-2
Control cable
KCT-22
Cable
fitting
GND
Transceiver
KRK-5 main panel
Display
GND
1
1
2
3
4
Fig. 2-3
Angle
bracket
1
2
2
Fig. 2-4