Models 2510 and 2510-AT
Performance Verification
1-2
Introduction
Use the procedures in this section to verify that Model 2510 accuracy is within the limits
stated in the instrument’s one-year accuracy specifications. You can perform these verification
procedures:
•
When you first receive the instrument to make sure that it was not damaged during
shipment.
•
To verify that the unit meets factory specifications.
•
To determine if calibration is required.
•
Following calibration to make sure it was performed properly.
WARNING
The information in this section is intended for qualified service personnel
only. Do not attempt these procedures unless you are qualified to do so.
Some of these procedures may expose you to hazardous voltages, which
could cause personal injury or death if contacted. Use standard safety pre-
cautions when working with hazardous voltages.
NOTE
If the instrument is still under warranty and its performance is outside specified lim-
its, contact your Keithley representative or the factory to determine the correct
course of action.
Verification test requirements
Be sure that you perform the verification tests:
•
Under the proper environmental conditions.
•
After the specified warm-up period.
•
Using the correct line voltage.
•
Using the proper test equipment.
•
Using the specified output signals and reading limits.
Environmental conditions
Conduct your performance verification procedures in a test environment with:
•
An ambient temperature of 18-28°C (65-82°F).
•
A relative humidity of less than 70% unless otherwise noted.
Warm-up period
Allow the Model 2510 to warm up for at least one hour before conducting the verification
procedures.
2510-902-01 (E - Mar 2010)(Service).book Page 2 Tuesday, March 16, 2010 1:04 PM
Содержание TEC SourceMeter 2510
Страница 3: ...2510 902 01 E Mar 2010 Service book Page 2 Tuesday March 16 2010 1 04 PM...
Страница 14: ...1 PerformanceVerification 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 28: ...2 Calibration 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 54: ...3 RoutineMaintenance 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 58: ...4 Troubleshooting 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 76: ...5 Disassembly 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 82: ...6 ReplaceableParts 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 92: ...A Specifications 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 2 33 PM...
Страница 96: ...B CalibrationReference 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 110: ...C CalibrationProgram 2510 902 01 E Mar 2010 Service book Page 1 Tuesday March 16 2010 1 04 PM...
Страница 119: ...2510 902 01 E Mar 2010 Service book Page 4 Tuesday March 16 2010 1 04 PM...