S535 Wafer Acceptance Test System Administrative Guide
Section 2: S535 site preparation and installation
S535-924-01 Rev. B / January 2019
2-11
12. Remove the tape from the packing material using scissors, taking care not to scratch the S535
system cabinet.
Figure 15: Cutting the wrap off the system
13. Move the S535 system cabinet to its final destination.
The system cabinet is shipped from the factory with all of the instruments installed. Most equipment
connections and wiring of instruments in the system cabinet was done at the factory.