Section 2: S535 site preparation and installation
S535 Wafer Acceptance Test System Administrative Guide
2-8
S535-924-01 Rev. B / January 2019
7.
Make sure that you retract the leveling feet on the bottom of the system (next to the casters) to
put weight on the casters and prepare the system to be rolled down the ramp.
Figure 9: Leveling feet
8.
Remove the four bolts from the bottom of the crate that are attached to the bottom of the S535
system cabinet using a 19 mm socket head on a socket wrench.
Figure 10: System bolted to the crate