Section 2: S535 site preparation and installation
S535 Wafer Acceptance Test System Administrative Guide
2-6
S535-924-01 Rev. B / January 2019
Figure 5: Opening the front of the crate
4.
Attach the ramp using the two bolts that are attached to the bottom front of the crate.
Figure 6: Front of the crate with ramp down