Model 2701 Service Manual
Calibration Reference
B-5
:INIT
(:CALibration:PROTected:INITiate)
Purpose
To initiate comprehensive and factory calibration procedures.
Format
:cal:prot:init
Parameter
None
Description
The
:INIT
command enables Model 2701 calibration when performing
these procedures over the bus. This command must be sent to the unit after
sending the
:CODE
command, but before sending any other calibration
command.
NOTE
The
:INIT
command should be sent only once before performing either DC, AC, or
factory calibration. Do not send
:INIT
before each calibration step.
Example
:CAL:PROT:INIT
Initiate calibration.
:LOCK
(:CALibration:PROTected:LOCK)
Purpose
To lock out comprehensive or manufacturing calibration.
Format
:cal:prot:lock
Parameter
None
Description
The
:LOCK
command allows you to lock out both comprehensive and
manufacturing calibration after completing those procedures. Thus,
:LOCK
performs the opposite of enabling calibration with the
:CODE
command.
NOTE
To unlock comprehensive calibration, send the
:CODE
command. To unlock
manufacturing calibration, hold in the OPEN key while turning on the power.
Example
:CAL:PROT:LOCK
Lock out calibration.
Содержание 2701
Страница 15: ...1 PerformanceVerification...
Страница 47: ...2 Calibration...
Страница 70: ...3 RoutineMaintenance...
Страница 78: ...4 Troubleshooting...
Страница 97: ...5 Disassembly...
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ...6 ReplaceableParts...
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ...A Specifications...
Страница 140: ...B CalibrationReference...