ZHEJIANG KAYO MOTOR CO., LTD.
the rear wheel axle gradually with another hand
Remove the rear wheel
Installing Steps:
The installment should be carried out in the reverse
order of removal.
TIRE INSPECTION
Checking Steps are as follows:
1. Check the tires if there are crosswise lines, holes, or
foreign bodies
2. Check the tire thread worn, if the height of tire plies
lower than minimum require, replace the tire right
away.
The minimum height requires: 3mm
CHECK TIRE PRESSURE
Check the tire pressure by using a pressure gage.
If it happens frequently with lower pressure problem,
find out if there is a deflation or not and contact the
Kayo Dealer for help.
Pressure advice
Front Tire
Rear Tire
TS90
250kPa
250kPa
NOTE
: Do the checking work only on cold tires.
CHECK SPOKE
spoke
Use your fingers to move the adjacent spokes to check
whether the tire spokes lack tension. If you find that the
spokes are loose and weak, you must check all the
spokes and both wheels.
If there is any further problem, please contact the
KAYO or KAYO dealer.
INSTALLING THE ENGINE
The installation steps are as follows:
1. The engine is suspended on the frame (pay attention to protect the appearance of the engine).
2. Install the carburetor on the intake elbow and fasten it with nuts and bolts.
www.kayomoto.com